Luzon grid stable

0
14

Luzon grid proved a stable platform on Sunday that allowed the National Grid Corporation of the Philippines to issue a Normal Condition advisory for Luzon.

According also to the Department of Energy (DoE), the South Luzon Thermal Energy Corp. Unit 1 of Ayala is now running on full load. It was synchronized to the grid at 2:03 a.m. Sunday and achieved full load at 8:50 a.m.

On forced outages and derated plants, the DoE said the Masinloc Unit 1 of San Miguel is running on a lower capacity of 304 MW.

Energy Secretary Alfonso Cusi said the DoE will continue to update the public on further developments in the power front.

SHARE
Previous articleBlackouts linked to corporate greed
Next articleEnrile smells sabotage in power, water shortage
Concept News Central
CONCEPTNEWSCENTRAL (CNC) is a news-gathering organization established by Concept Group Inc., a corporation operating under the laws of the Republic of the Philippines, with business address located at 3450 Concept Building, Florida Street, Makati City, Metropolitan Manila, the Philippines. Read More...

LEAVE A REPLY